| Item type | Current library | Status | Barcode | |
|---|---|---|---|---|
|
|
. | Not for loan | MPP020 |
Contents
List Of Abbreviations;
List Of Illustrations;
List Of Tables;
1. Introduction;
1.1 Policy Environment;
1.1.1 Electricity Generation;
1.1.2 Electricity Transmission;
1.1.3 Electricity Distribution;
1.2 Quality Of Electricity Supply;
1.3 Electricity Supply In Karnataka;
1.3.1 Escoms In Karnataka;
1.4 Need For Study;
9 1.5 Research Problem;
1.6 Objectives Of The Study;
2. Literature Review;
2.1 Electricity Access;
2.2 Electricity Supply And Reform Across The World;
2.3 Indian Electricity Sector;
3. Methodology;
3.1 Design Of Study;
3.2 Data Collection;
3.3 Data Analysis;
4 Findings;
4.1 Performance Evaluation Of Escoms;
4.1.1 Regulatory Framework;
4.1.2 Performance Of Bescom;
4.1.3 Performance Of Cesc;
4.1.4 Performance Of Gescom;
4.1.5 Performance Of Hescom;
4.1.6 Performance Of Mescom;
4.2 Comparative Financial Performance Of Escoms;
4.2.1 Financial Performance;
4.2.2 Measure Of Efficiency;
4.2 Role Of Renewable Energy;
4.2.1 Regulatory Framework;
4.2.2 Evaluation Of Role Of Renewable Energy;
4.3 Effect Of Open Access;
4.3.1 Regulatory Framework;
4.3.2 Evaluation Of Open Access;
5. Summary And Conclusion;
Reference;