000 01621cam a2200373 a 4500
999 _c114798
_d114798
001 14370572
003 OSt
005 20210101101549.0
008 060509s2004 enka b 001 0 eng
010 _a 2006355234
015 _aGBA4Y5215
_2bnb
016 7 _a010982209
_2Uk
020 _a0421778202
022 _29780414028531
035 _a(OCoLC)ocm56965651
040 _aUk
_beng
_cUk
_dDGU-L
_dOCLCQ
_dCaQMU
_dDLC
042 _alccopycat
043 _ae-uk-en
050 0 0 _aKD1596
_b.T74 2004
082 0 4 _a346.022 TRE
_222
100 1 _aTreitel, G. H.
245 1 0 _aFrustration and force majeure /
_cby Guenter Treitel.
250 _a2nd ed.
260 _aLondon :
_bSweet & Maxwell,
_c2004.
300 _alxxxii, 673 p. :
_bill. ;
_c24 cm.
504 _aIncludes bibliographical references and index.
505 _aTable of contents Introduction. Development; Impossibility in general: destruction of subject matter; Other types of impossibility; Partial and temporary impossibility; Impracticability; Frustration of purpose; Illegality; Prospective frustration; Alternatives; Frustration of leases; Contractual provisions for supervening events; Foreseen and foreseeable events; Self-induced frustration; Effects of frustration; Nature of the doctrine
650 0 _aImpossibility of performance
_zEngland.
650 0 _aDischarge of contracts
_zEngland.
650 0 _aVis major (Civil law)
_zEngland.
906 _a7
_bcbc
_ccopycat
_d2
_encip
_f20
_gy-gencatlg
942 _2ddc
_cBK